+Compression Plug Insert | FerruleXSkip to content
Compression Plug Insert — FerruleX stainless steel fittings

Compression Plug Insert

Compression Plug Insert: insert blank for stainless steel compression fittings ports. SS316/304. FerruleX RFQ. Stocked sizes ship fast. Fast stock shipping.

Brand
FerruleX
Material
SS316 / SS316L / SS304
Type
Compression plug insert
Series
Double ferrule
Order mode
Factory RFQ

Request a factory quote

  • Stock5–7 days after confirmation
  • Make to order15–25 days production
  • Payment / termsT/T ~30% or L/C · FOB Shanghai / Ningbo
  • OEMLogo and drawings accepted · price on RFQ

Description

Compression plug inserts seat inside the fitting to blank a tube port when a full three-piece kit is not required. FerruleX machines inserts in SS316/SS316L/SS304 for the double-ferrule OD you name on the RFQ. Service kits and field blanks use inserts to close a port that already has a nut on the body. They are not a substitute for the correct ferrule set if the nut is missing. State tube OD or fitting code on the FerruleX factory RFQ. Order a few extra inserts per OD; they disappear easily in field service bags.

Inserts are easy to lose in a parts bag — order a few extras for each OD on the skid. If the port will see frequent open/close cycles, prefer the full plug kit with fresh ferrules each time. FerruleX bags inserts by OD with desiccant for export shipments. Insert plug for double-ferrule ports. SS304 / SS316 / SS316L. Tube OD or fitting code.

Part
Insert plug for double-ferrule ports.
Materials
SS304 / SS316 / SS316L.
RFQ
Tube OD or fitting code.

Specifications

SpecificationValue
BrandFerruleX
MaterialSS316 / SS316L / SS304
TypeCompression plug insert
SeriesDouble ferrule
Order modeFactory RFQ

Request Quote

Prices stay on the RFQ. Send size, material, quantity and destination — the factory replies with price, lead time and packing.

Request a factory quote

Shipping & packing

Parts ship in a bag, inner carton and export carton. Large lots can go in a wooden case with a packing list and invoice. Default term is FOB Shanghai or Ningbo. Full notes are on thedelivery page.

Questions buyers ask

What should I send for a quote?

Size, material (SS304, SS316 or SS316L), quantity, end connection and destination. Add a sketch if the two ends are different.

How fast can this ship?

Stocked sizes usually leave 5–7 days after you confirm the quote. Make-to-order runs are about 15–25 days in production, then transit. Name the port if you want CIF.

Can I order a small trial or put my logo on it?

Yes. Trial quantities are quoted, and OEM marking or drawings are accepted. Payment is normally T/T with about 30% deposit, balance before shipment, or L/C at sight.

Related products